StrateQX logoStrateQX
Sticky headerShrink into a floating bar when scrolling
Get Your Strategy Today
Go-to-Market Planner·Planning

Find out whether your revenue target is arithmetically possible

Enter the number you have to hit. The planner works backwards to the traffic, leads and opportunities that produce it, then forwards into a channel mix, a phased 90-day plan, and the risks that will break it.

FreeNo sign-upFour GTM motions
Backwards funnel mathsBudget sufficiency checkExportable 90-day plan
gtm-planner.strateqx.com/plan
1
2
3
4
Weeks to launch
12
Phased in 3 stages
Channels selected
4
2 primary, 2 test
Launch budget
$46k
Across the sequence

Your buying cycle is long enough that paid search alone will not carry the launch. The plan front-loads content and partnerships in weeks one to four so there is something for paid traffic to convert into.

Why this tool exists

The problem

Most go-to-market plans fail for an unglamorous reason: the top of the funnel was never sized against the target it was meant to deliver. The strategy is sound, the positioning is fine, the channels are sensible, and the plan requires forty thousand monthly visitors that nobody ever calculated and nobody has any route to producing.

Why traditional approaches fail

GTM planning usually starts with channels and works forward, which means the number at the end is whatever the plan happens to produce. When that falls short of the target, the response is to add channels rather than to question whether the arithmetic ever worked. Templates make this worse, because they organise the plan beautifully without testing whether it adds up.

Why this AI-powered approach is different

This planner starts at the revenue target and divides backwards through every conversion step to the traffic required, then checks that number against the budget available. If the plan is not fundable at a viable cost of acquisition, it says so before anyone commits to it publicly, which is the cheapest moment to find out.

Expected outcomes
  • The customer count, opportunity volume and monthly traffic your target actually requires
  • A verdict on whether the budget can deliver it at a viable acquisition cost
  • A channel mix weighted for your motion, stage and budget size
  • A phased 90-day plan with workstreams and exit criteria for each phase
  • Six KPIs with targets, plus the risks most likely to break this specific plan

Who it's for

Anyone who has to commit to a number in public.

Founders

Sizing a launch before committing runway to it.

CMOs

Pressure-testing a board-approved target against the funnel it needs.

Product Marketers

Building the launch plan for a new product or market.

Sales Leaders

Checking whether marketing's plan produces the pipeline coverage quota needs.

Growth Teams

Sequencing channels so each one proves out before the next is added.

Finance Teams

Validating the acquisition cost implied by a revenue plan.

Agencies

Building a costed launch plan a client can actually execute.

Startups Entering a New Market

Sizing an expansion where no conversion baseline exists yet.

How it works

Target in, complete plan out.

1Set the motion and stage

Sales-led, product-led, hybrid or e-commerce, because it changes everything downstream

2Enter the target and budget

Revenue goal, contract value, sales cycle and available spend

3Set your conversion rates

Measured if you have them; the plan flags it if you do not

4Read the plan

Funnel requirement, channel mix, 90-day phases, KPIs and risks

Features

A plan with arithmetic underneath it.

Backwards funnel maths

Divides from the revenue target through every conversion step to the monthly traffic required. This is the number that most plans never calculate.

Budget sufficiency check

Compares the implied acquisition cost against what your motion can actually sustain, and tells you plainly if the plan is not fundable.

Motion-aware channel mix

Four channel templates, adjusted for stage urgency and trimmed for budget size, because three channels done well beat six that are starved.

Phased 90-day plan

Foundation, proof and scale, each with workstreams and exit criteria so the next phase cannot start on wishful thinking.

KPIs with targets

Six numbers, each with a calculated target, a review cadence and the reason it earns a place on the list.

Risk analysis

Generated from your specific inputs, whether that is a thin budget, a long cycle, a small team or no baseline, with a mitigation for each.

What you'll get

A complete plan you can take into a leadership meeting.

The required funnel

Visitors, leads, MQLs, SQLs, opportunities and customers, monthly.

Implied CAC and viability

What each customer will cost, against what your motion can bear.

Channel allocation

Budget by channel with the rationale and time-to-impact for each.

90-day roadmap

Three phases, workstreams and exit criteria.

KPI framework

Six metrics with calculated targets and review cadence.

Twelve-month trajectory

Ramped revenue against a flat target, with first-revenue month marked.

See it in action

Preview

The planner is live at the top of this page with a B2B example loaded.

gtm-planner.strateqx.com/plan
1
2
3
4
Weeks to launch
12
Phased in 3 stages
Channels selected
4
2 primary, 2 test
Launch budget
$46k
Across the sequence

Your buying cycle is long enough that paid search alone will not carry the launch. The plan front-loads content and partnerships in weeks one to four so there is something for paid traffic to convert into.

Why it is worth building properly

Fails the plan early

A target that cannot be funded is much cheaper to discover in planning than in month eight, when it is public and the year is unrecoverable.

Makes the traffic requirement explicit

Once the monthly visitor number is on screen, everyone can see whether the channel plan has any chance of producing it.

Aligns marketing and sales

Pipeline coverage and MQL acceptance rate are shared numbers. Putting targets on both ends the argument about lead quality.

Sequences the work

Exit criteria stop phase two starting before phase one has proved anything, which is the discipline most launches lack.

Use cases

Where a costed plan beats a document.

Series A hitting a board-set number
Problem

A revenue target agreed in a board meeting with no funnel behind it.

How the tool helps

Enter the target, the budget and the current conversion rates.

Expected outcome

Either confirmation the plan is fundable, or the arithmetic needed to renegotiate before the year starts.

New product launch
Problem

Positioning is ready but nobody has sized the demand generation.

How the tool helps

Set stage to pre-launch and use conservative conversion assumptions.

Expected outcome

A 90-day plan that treats the first quarter as measurement rather than performance, with the right exit criteria.

Entering a new geography
Problem

No conversion baseline exists in the new market.

How the tool helps

Model with home-market rates, then re-run at half those rates.

Expected outcome

A budget range that survives the pessimistic case rather than one that only works if everything goes right.

Marketing and sales disagreeing on lead quality
Problem

Volume targets hit, pipeline targets missed.

How the tool helps

Model the funnel with the real MQL-to-SQL rate rather than the assumed one.

Expected outcome

A shared view of exactly which conversion step is failing, and what fixing it is worth in traffic terms.

The reasoning behind the plan

The funnel maths is pure division: revenue divided by contract value gives customers, divided by win rate gives opportunities, and so on up to the traffic requirement. There is nothing clever about it, which is precisely why it is useful: it cannot be argued with, only re-input.

The judgement sits in the channel mix and the sequencing. Each motion has a template weighting derived from how these businesses actually acquire customers, then two corrections are applied. Stage urgency shifts weight toward fast-impact channels for earlier-stage plans, because a company that needs proof in one quarter cannot wait out a nine-month compounding curve. Budget size then caps the number of channels, so below a threshold the long tail is dropped entirely and the budget redistributed, because three properly funded channels beat six starved ones.

The viability check applies a ceiling on acquisition cost as a share of first-year contract value: about a third for sales-led motions, half for product-led, and a third for e-commerce. These are rules of thumb rather than laws, but a plan that breaches them is one where something has to give, and it is better to name that in planning than to discover it in the second quarter.

Backwards, not forwards

Starting at the target exposes the gap. Starting at the channels hides it until the year is half gone.

Exit criteria over deadlines

Each phase ends when it has produced evidence, not when the calendar says so. That is what stops a plan scaling something that never worked.

Risks from your inputs

A two-person team, a nine-month cycle or a thin budget each generate their own named risk and mitigation, rather than a generic list.

Frequently asked questions

Related resources

What comes before and after the plan.

Check the arithmetic before you commit to the number

Twenty minutes now is considerably cheaper than discovering in month eight that the funnel was never sized for the target.